欧盟GMP《无菌药品》 条款
8.61. There should be adequate assurance of air removal prior to and during sterilisation when the sterilisation process includes air purging (e.g. porous autoclave loads, lyophilizer chambers). For autoclaves, this should include an air removal test cycle (normally performed on a daily basis) or the use of an air detector system. Loads to be sterilised should be designed to support effective air removal and be free draining to prevent the build –up of condensate.
当灭菌程序包括空气排除(如,高压灭菌器多孔物品装载、冻干机)时,应在灭菌前和灭菌过程中确保充分排除空气。对于高压灭菌器,应当有空气移除测试程序(BD 测试)(通常每天进行)或空气检测器系统。待灭菌装载物的设计应能保证有效的排除空气,并便于排水以防止冷凝水的聚集。